INTRUSIVE
Image 6. Building clearance is an intrusive information source
Where intrusive operations have been conducted, reports should include technical information on IEDs that have been removed or destroyed. This should be reported in a consistent manner to enable inter- organisational analysis to establish trends and ensure that procedures remain appropriate.
TECHNICAL INFORMATION
Technical information should be recorded in detail for IED components. An example below:
Image 7. A tripwire IED, the components of which are described in Table 1
IED threat assessment
22
Powered by FlippingBook