IED Clearance Good Practice Guide

Image 36. Inside the trunk post firing of the VBIED extractor

Image 37. MA IEDD operator inspecting the results of the VBIED extractor

Image 38. Location of the two 155 mm projectiles post firing of the VBIED extractor

IEDD techniques and procedures

424

Powered by