Image 5. Detonator is rolled slightly to expose the PAT on the other side. This is then cut in the same manner as above
STEP 3 – REMOVING THE DETONATOR
Image 6. Detonator is now removed from the detonating cord. Note: the IEDD operator is handling the detonator by the base at all times
IEDD techniques and procedures
428
Powered by FlippingBook