IED Clearance Good Practice Guide

Image 5. Detonator is rolled slightly to expose the PAT on the other side. This is then cut in the same manner as above

STEP 3 – REMOVING THE DETONATOR

Image 6. Detonator is now removed from the detonating cord. Note: the IEDD operator is handling the detonator by the base at all times

IEDD techniques and procedures

428

Powered by